top of page
Background Rocks Image.JPG

Cased Hole Wireline Technical Consulting

Cased Hole Log Analysis & Technical Support.

WaveFORMS

WaveForms_edited.jpg

Technical Bulletins on Well Integrity Log Responses

AER Directive 51 - Injection and Disposal Well Application Analysis Reports

D-51 Temp Log.JPG

AER Compliant Reports for Temperature and Hydraulic Isolation reports.

Cement Integrity Analysis

CBL Image Clean.JPG

Acoustic Cement Bond Log Analysis

Sustained Annular Gas/Surface Casing Vent Leak Analysis

Noise Log Example 3.JPG

Full package analysis on Noise (Filter Band Pass & Spectral), Casing Integrity, Cement Integrity and Temperature data.

bottom of page